Skip Navigation

Cleaner Lewisham

Selected Report

Near 1 Lara Close, London, SE13 6HZ

Lewisham London Borough - Rushey Green

Description

No Road Sweeping in the Street again this MONTH. I know the close is on a incline but if the street sweepers can't go up or down Lara Close with a push cart, please send a street cleaner at least twice a month. <br/><br/>PLEASE CLEAN OUR CLOSE REGULARY, LIKE GEORGE LANE AND EVERYWHERE ELSE WHO GETS SWEEP EVERYDAY, WHILE WHEELING PAST LARA CLOSE SE13 6HZ.<br/><br/>If someone can do something about the weeds growing up by 6inches between the paving stones that will also be a help too. There was a Highway Maintenance Van and crew parked in the close from 11am to 4:30pm last week and they did nothing. <br/><br/>Thanks

Details

Reported
18/08/2022 15:40
Visible to public
Yes
Category
Street cleaning
Status
Closed
Completed
Yes On 12/01/2023 15:54
Job Code
3044415

Other items related to this report

Works completed -1 Lara Close, London, SE13 6HZ 12/01/2023 15:53 Works completed

Find reports

(date format: dd/mm/yyyy)
Reset
Fly tipping by the phone box - again -Hop Burns &amp; Black, Arch 1, Deptford Station, Deptford High Street, London, SE8 4NS
 In Progress
28/08/2026 13:28 Fly tipping by the phone box - again
In Progress
Full Details
Yet more fly tipping under the bridge - boxes of cardboard and stuffing that could easily have asbestos issues. Area is just a disgrace these days -Hop Burns &amp; Black, Arch 1, Deptford Station, Deptford High Street, London, SE8 4NS
 In Progress
28/08/2026 13:27 Yet more fly tipping under the bridge - boxes of cardboard and stuffing that could easily have asbestos issues. Area is just a disgrace these days
In Progress
Full Details
Builders dumping waste on pavement, pedestrians have to go into road to pass. The building waste has been there for over a month now-33 Panmure Road, London, SE26 6NB
 In Progress
28/08/2026 13:22 Builders dumping waste on pavement, pedestrians have to go into road to pass. The building waste has been there for over a month now
In Progress
Full Details
Fly tipped rubbish bag-42 Gilmore Road, Hither Green, London, SE13 5AA
 In Progress
28/08/2026 13:12 Fly tipped rubbish bag
In Progress
Full Details
Please empty bins in tennis courts which look like they have not been emptied all summer.-Mayow Park
 In Progress
28/08/2026 13:02 Please empty bins in tennis courts which look like they have not been emptied all summer.
In Progress
Full Details
Rubbish -1 Crossleigh Court, 407B, New Cross Road, London, SE14 6LA
 In Progress
28/08/2026 12:45 Rubbish
In Progress
Full Details
Environmental hazard, large amount of domestic waste dumped in front yard of no 91 Bradgate Road. It smell and is attracting vermin
PLEASE REMOVE-89 Bradgate Road, London, SE6 4TR
 In Progress
28/08/2026 12:44 Details Passed to Enviro Crime Enforcement
In Progress
Full Details
Fallen branch -1 Crossleigh Court, 407B, New Cross Road, London, SE14 6LA
 In Progress
28/08/2026 12:44 Fallen branch
In Progress
Full Details
Drug paraphernalia -4 Exeter Way, London, SE14 6LL
 In Progress
28/08/2026 12:43 Drug paraphernalia
In Progress
Full Details
Over growing hedge on to pavement from garden and bin on already narrow pavement. Pavement is uneven due to tree roots-3A, Wisteria Road, Hither Green, London, SE13 5HW
 In Progress
28/08/2026 12:42 Details Passed to Highways
In Progress
Full Details
Pothole around access cover-6 Felday Road, London, SE13 7HJ
 In Progress
28/08/2026 12:42 Details Passed to Highways
In Progress
Full Details
Pathetic attempt to fill a pothole. The contractor should be made to do it again. Not enough filler and not to the edges-6 Felday Road, London, SE13 7HJ
 In Progress
28/08/2026 12:40 details Passed to Highways
In Progress
Full Details
Builders working at No.126 dumped their rubbish into neighbour’s bins and on the pavement.-126 Tanner&#39;s Hill, London, UK
 In Progress
28/08/2026 12:38 Builders working at No.126 dumped their rubbish into neighbour’s bins and on the pavement.
In Progress
Full Details
Pathetic pothole repair attempt! Insufficient filler and did not fill an adjacent hole. The contractor should be made to complete the job. This should never be signed off-13A, Felday Road, London, SE13 7HQ
 In Progress
28/08/2026 12:38 Details Passed to Highways
In Progress
Full Details
Commercial freezer and mattress -Robert Timmons Furniture Ltd, 81 New Butt Lane North, London, SE8 4RD
 In Progress
28/08/2026 12:37 Commercial freezer and mattress
In Progress
Full Details
Small potholes-34 Felday Road, London, SE13 7HJ
 In Progress
28/08/2026 12:35 Details Passed to Highways
In Progress
Full Details
Pothole repairs degrading either side of a speed himp-34 Felday Road, London, SE13 7HJ
 In Progress
28/08/2026 12:32 Details passed to Highways
In Progress
Full Details
Poor Pothole repair breaking up and subsiding -52 Felday Road, London, SE13 7HJ
 In Progress
28/08/2026 12:30 Poor Pothole repair breaking up and subsiding
In Progress
Full Details
Graffiti on library sign -33 Old Road, London, SE13 5SU
 In Progress
28/08/2026 12:28 Graffiti on library sign
In Progress
Full Details
30 cm pothole on centre line-61 Felday Road, London, SE13 7HQ
 In Progress
28/08/2026 12:28 Details Passed to Highways
In Progress
Full Details